New Construction for Plumbers

Cedarburg Light & Water Utility requires full port brass ball valves before and after the meter setting.

The meter setting should be anchored to the wall and sit between 30” & 40” above the floor. 

No unauthorized usage of un-metered water is permitted anytime during construction. Contractors shall contact the Cedarburg Light & Water Utility before the water is turned on. Contractors are responsible for all unauthorized water usage such as unmetered lawn sprinkling. Any violation can result in a citation and appropriate fines.