New Construction for Plumbers

Cedarburg Light and Water Utility requires full port brass ball valves before and after the meter setting.

The meter setting should be anchored to the wall and sit between 30” & 40” above the floor. 

No unauthorized usage of un-metered water is permitted anytime during construction. Contractors shall contact the Cedarburg Light & Water Utility before the water is turned on. Contractors are responsible for all unauthorized water usage such as unmetered lawn sprinkling. Any violation can result in a citation and appropriate fines.